Foundry Part 1

Home
Up

<Prev> 1 2 3 4 5 6 7 8 9 <Next>

  • This is the unwitting subject of my attention. It is a 16" diameter well tank. My plan is now to use 1" Kaowool insulation and a 3" thick layer of KS4 Plus 2400 refractory to make a final inside cavity of 8".

  • The first step was to setup a jig to mark a straight line around the circumference of the tank for cutting it into a furnace and lid. I am using the bottom of the tank to be the lid, as it had a 4" diameter hole in it where the bladder met the plastic cap that had the pipe-thread fittings in it.

  • Here is the tank marked out.

<Prev> 1 2 3 4 5 6 7 8 9 <Next>

 
This site last modified on Sunday, August 15, 2004 04:25:14 PM